Pacific Data Hub
Login
Login
  • Home
  • Microdata Library
  • Citations
  • Access Process
  • Terms of Use
  • Policy and Procedures
  • Acknowledgements
    Home / Central Data Catalog / SLB / SLB_2015_ES_V01_M / variable [V1099]
SLB

Enterprise Survey 2015

Solomon Islands, 2015 - 2016
Reference ID
SLB_2015_ES_v01_M
Producer(s)
World Bank
Collections
Solomon Islands
Metadata
Documentation in PDF DDI/XML JSON
Created on
Apr 01, 2019
Last modified
Apr 01, 2019
Page views
82463
Downloads
6840
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • solomon_islands_2015_full_data

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: solomon_islands_2015_full_data

Overview

Valid: 32
Invalid: 119
Type: Discrete
Decimal: 0
Start: 189
End: 190
Width: 2
Range: -9 - 90
Format: Numeric

Questions and instructions

Literal question
In reference to that application for a water connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category Cases
-9 Don't know (spontaneous) 0
0%
-8 Refusal (spontaneous) 0
0%
-7 Does not apply 0
0%
-6 4
12.5%
1 3
9.4%
5 5
15.6%
7 6
18.8%
10 3
9.4%
14 8
25%
21 1
3.1%
30 1
3.1%
90 1
3.1%
Sysmiss 119
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Wait for water connection. Self-explanatory
Back to Catalog
Pacific Data Hub Microdata Library

© Pacific Data Hub Microdata Library, All Rights Reserved.